    Krobia I Wind Farm

    A 33-MW wind farm consisting of 11 AW116/3000 wind turbines on 120m-high concrete tower. It covers the electricity demand of more than 40,000 homes. It entered operation in 2013.

    General information

    Location
    Municipality of Krobia, Poland
    Capacity
    33 MW
    Start up
    2013

     

    Wind turbine generator

    Model
    ACCIONA Windpower AW 116/3000
    Rotor diameter
    116 m
    Wind class
    IEC IIa
    Tower
    Concrete. 120 m hub height 
    Blade
    AW57.6
     

    Key points

       
    • Foundations and installation of 11 wind turbines .
    • 9 km access roads/tracks. 
    • 19 km underground medium-voltage network. 
    • 110/30/12 kV substation. 
    • 18 km underground high-voltage line. 
    • Concrete towers with assembled segments that are manufactured near the site.
    • Up to 150 local people employed in the concrete towers plant, which increases the benefits to the community associated with the project.
    • Medium-tension generation to avoid the use of transformers.